Show the details of approval procedure for building plan in Cross River State


Cross River State Government is determined to provide a good and sustainable environment for housing and other general public facilities.

Getting a building plan approval is an indication that the building complies with building laws and regulations. Beside this, it is evidence to proof that appropriate authorities or agencies are aware of such constitution.

The building plan will first undergo a process of vetting, between the period of twenty-one days (21) in form with the Cross River State Building Regulation of 1984 as amended in1987; Urban and Regional Planning Law of 1992.

The period of 21 days; mean the process of building plan application from submission to approval state witting 21 working days. It seeks to eliminate all identified causes of delay, stress and ineffective that have hither to worked against the building plan approved.

Breakdown of the 21 working day is as follows:

  • Bank transaction:                3 days 
  • Town Planning Analysis       4 days
  • Architecture Assessment      3 days
  • Engineering Assessment      10 days
  • Final approval by the Planning Authority: 1day

Registration Fees: This step is taken by a developer towards the approval of his building/plans. A specified amount of money is paid to the Nigerian Institute of Town Planner (NITP) account through a specified bank account.

SUBMISSION OF THE BUILDING PLAN AND OTHER REQUIRED DOCUMENT ALONGSIDE WITH THE APPLICATION LETTER
The submission of plans to the Town Planning Office for assessment and approval, application letter is written either by the client or by the Architect on behalf of the client. It is written to the Town Planning Office for building approval purpose.

ASSESSMENT OF DRAWINGS/PLAN       
This is the stage in which the submitted documents are examined/ assess. The Town Planner Officer check for factors such as set-backs for both bungalow or storey building and other landed structure.
All this procedures is carried out within 21days.

Document Required for Existing Order Required 

  • 3/4 sets of drawing
  •  Copy of survey plan 
  • 3 years tax clearance of client 
  •  Receipt of payment of registration fee 
  • Affidavit


GOVERNMENT LAND

  • Evidence of ownership/Title document
  • Stamped duty land purchase receipt
  • Certificate of occupancy/Governor's consent
  • Evidence of complete payment including offer, acceptance and allocation letter.
  • Photocopy processing fee receipt
  • For corporate bodies/organizations

CORPORATE BODIES/ORGANIZATIONS

  1. Company Tax Clearance
  2. Certificate of Incorporation

Types of Drawing Required for the Approval
1.    Architectural drawing
2.    Electrical drawing
3.    Structural drawing
4.    Site layout plan
5.    Geotechnical or soil analysis
6.    Street name, house number and phone number
All drawing and reports and expected to be endorsed by relevant registered professionals.

CLASSES OF DRAWINGS REQUIRED FOR APPROVAL

  1. Four (4) sets of Architectural drawing
  2. Four (4) sets of Structural drawing and calculation
  3. Four (4) sets of Mechanical electrical drawing

Special Building
·        Power station
·        Tent
·        Stadium
·        Ware house
·        Institution building
·        Filling station
·        Industries
·        Hotels
·        Refinery
·        Barrack
·        Ministry
·        Banks

CONCLUSION
Cross River State Ministry of Land & Housing has evolved measure which it believes would eliminate all previous bottle-necks that previously caused delays in building delivery process. The public is hereby urged to come forward to submit their building plans application to its various Town Planning Offices and Development permit approval obtained before commencing development.